EN 10204 3 1 SEAMLESS STEEL PIPE SUPPORT

There are many manufacturers of EN 10204 3 1 SEAMLESS STEEL PIPE SUPPORT, and in large-scale construction projects, we need to use a large number of pipe fittings. There are various connection methods of pipe fittings, and each connection method also has its own advantages and disadvantages, so everyone In the construction, it is necessary to choose the appropriate connection method, so as to make the pipe fittings have a good use effect. The following is a detailed introduction to the connection method of stainless steel pipes and installation precautions!

 

What does the EN 10204 3 1 SEAMLESS STEEL PIPE SUPPORT link look like?

The commonly used connection method is flexible connection. Its advantages are that it can be disassembled at will and easy to install, but it has higher requirements for installation conditions; there is a compression connection, which has the advantages of fast installation, disassembly, and single connection stability. Poor, prone to leakage; there is a double-pressed connection, which has the advantages of firm connection, good sealing, and convenient installation, and is the main connection method for stainless steel pipes.

 

EN 10204 3 1 SEAMLESS STEEL PIPE SUPPORT What should I pay attention to when installing?

1. Before installation, an appropriate amount of EN 10204 3 1 SEAMLESS STEEL PIPE SUPPORT should be prepared. If the number of steel pipes is too large, material waste will occur; if the number of steel pipes is too small, it will be troublesome and expensive to purchase again.

2. Before installation, it is necessary to conduct a comprehensive inspection of the steel pipe and its accessories. If the steel pipe is damaged, leaking, etc., if there is any damage, the new steel pipe should be replaced in time, and the steel pipe should be installed after it is intact.

3. When installing, pay attention to whether the direction of the stainless steel pipe meets the requirements. Since most of the stainless steel pipes are installed in the buried wall, once there is a problem, it is difficult to find. For maintenance reasons, it is recommended that the water pipe be installed on the top to facilitate later maintenance.

4. During installation, corresponding anti-corrosion measures should be taken to avoid corrosion of steel pipes in the future. In addition, stainless steel pipes should not be in direct contact with cement during installation.

5. After installation, it is necessary to carry out a closed water test. If the water pipe leaks and other faults, the fault should be eliminated in time and repaired by professionals.